Alliance Medical Gas was chosen to verify the new installation

IMG_10571

 

Alliance medical gas was chosen to verify the new installation of the master alarm panel in both the engineering services office and the boiler plant of the Phoenix vamc. This also included the relocation of the bulk oxygen site and the installation of a third bulk reserve tank.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

Post Navigation